1. What tools will I need to install the drain myself?
You will need to rent a concrete cutter and a cement mixer, hand mixing in a wheel barrel will work also.
2. How many bags of cement do I need?
A good measurement is one bag of 2/3 cu.ft. Ready Mix per foot.
3. How wide should I cut the asphalt?
Make two cuts 12" or wider for the width of your driveway.
4. What do I use for a guideline to make the cuts straight?
Place two strips of masking tape 12" apart for the full width of your driveway.
5. How deep do I need to dig the trench?
You want a square trench 7" deep from the top of the surface. The top of the drain will set 1/2" below grade. The bottom of the channel will set 4" off the bottom of the trench for concrete.
6. Do the grates need to be in the channel when I pour the concrete?
Yes. Grates are shrink wrapped to give a protective layer while you pour the concrete.
7. Do I have to tie the drain down to keep it from floating when I pour the concrete?
No. This is a major problem with other drain designs. The LTEC Drain does not float.
8. What kind of warranty do you offer?
One year on manufactures defects.
